Signes Architecture & Urbanisme

Signes Architecture & Urbanisme

Bordeaux tramway 

Buildings along the line · Extension of line A to Mérignac airport (Bordeaux) 

Small buildings that blend into the city and show the modernity of the tramway. 

Two technical buildings and a bike shelter for the extension of tram line A to Bordeaux airport. 

Key facts 

Client

Bordeaux Métropole (Mobility Department, Major Works and Transport Investment)

Team

Artelia Ville & Transport (lead), SCE, Signes Paysages (landscape and urban design), Signes Archi (architect)

Site

Mérignac airport area, between Quatre Chemins station and Bordeaux airport

Buildings

2 (Vigneau and Beaudésert)

Cost

€899,038.87

Timeline

2019 to 2022

The programme 

Tramway projects need several small buildings for running the infrastructure. Two were built for the extension of line A: 

  • Vigneau: one building with the traction substation (SSR), a utilities room, a railway signalling room and a bike room. 
  • Beaudésert: one building with the traction substation, a utilities room and a railway signalling room. 

The concept 

The buildings blend into their existing context, while their image matches the modernity of the tramway. 

Mission of the team 

Design and construction of the buildings needed to run the extension of line A, between Quatre Chemins station and Bordeaux Mérignac airport. 

Mission of Signes Archi 

Design and construction of the technical buildings and bike shelters. 

Costs by building 

  • Vigneau (substation and bike shelter): €527,466.47 
  • Beaudésert (substation): €379,824.90 

Scope and themes: Design · Construction supervision